FTP Booster
Raise your FTP over 8 weeks: a build from aerobic base to tempo, block and VO2max work. Weeks with two hard sessions always separate them with an easy ride.
Advanced · 8 weeks · ~32h total · TSS 1523
Week 1 Base 3 sessions · ~3.2h · TSS 160
Week 2 Base 3 sessions · ~4.3h · TSS 214
Week 3 Build 1 3 sessions · ~4.2h · TSS 189
Week 4 Build 1 4 sessions · ~5.7h · TSS 276
Two hard sessions this week (tempo and block) — ride the easy day between them, don’t stack them back to back.
Week 5 Recovery 2 sessions · ~1.7h · TSS 113
Lighter week to absorb the last block — keep everything easy.
Week 6 Build 2 3 sessions · ~4.7h · TSS 238
Week 7 Build 2 4 sessions · ~6.3h · TSS 285
Block and VO2max in the same week — again, keep the easy day between them.
Week 8 Taper & Test 2 sessions · ~1.9h · TSS 48
Short and sharp — arrive fresh for an FTP test at the end of the week.